PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Repairing the sidewalk at Rahway Ave. (800x600).jpg Stripping the platforms at Elev. 1,2,3 (4th Floor) Facing South (800x600).jpg Stripping the slip forms at Stair -4 (4th Floor) Facing East (800x600).jpg UCFC Site Facing North-West (800x600).jpg
Next page Repairing the sidewalk at Rahway Ave. (800x600)
Repairing the sidewalk at Rahway Ave. (800x600)